IMM-12
RunningSumitomo Demag El-Exis SP 300 · 300 t clamp force · Oyonnax Plant
Last seen 03:17:43
All pressesDigital twin
Live machine view
Animated from live telemetry: cycle time, status and hopper level. Drag to rotate, scroll to zoom.
Running
Current job
cable gland
Mold
M-7519
Material
PBT
Cavities
16
Shot weight
11.9 g
Target cycle
12.5 s
Next maintenance
41d 22h
Process
Live process values
Cycle time
15.10s
Melt temp.
278°C
Mold temp.
64°C
Injection
1,313bar
Hold pressure
478bar
Hopper
49%full
Efficiency
OEE
63%
81.6%
Availability
84.0%
Performance
92.4%
Quality
Production
Today's output
10,720
shots of 17,625 planned · 171,520 parts
Scrap rate
1.82%
Scrap shots
195
Goal progress
61%
Shots per hour
Good and scrap shots today
Production day starts at 06:00.
Alarms
Alarms (1)
Short shot detected
2026-11-04 23:33
Process history
Cycle time, scrap and melt temperature
Cycle time · s (target 12.5 s)
Scrap · %
Melt temperature · °C