GN-02

Working

Generator set · Caterpillar XQ230 (2013) · 13,071 h · Dominion Creek

Last seen 03:41:26

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Power WP-2
Unattended unit

Wash plant

s-dom-wp2

Hours today

9.8 h

Cycle time

—

Cycles today

—

Engine hours

13,071 h

Next service

in 469 h

Telemetry
Live readings

Engine speed

1,803rpm

Coolant

93.2°C

Output

150kW

Voltage

605V

Frequency

60.12Hz

Fuel burn

39L/h
Fuel
Tank level
44%

483 L

In tank

39.0 L/h

Burn

12.3 h

Range

Utilisation
Hours on this shift

9.8 h

of a 12 h shift · 82% utilisation

Load

100%

Engine speed

1,783 rpm

Coolant

93 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %